Billericay and District Angling Club run a site known as Straits Mill. This former gravel extraction site was converted to a fishing club and provides high-quality riparian habitat adjacent to the River Blackwater and the Braintree Council owned Bocking Blackwater Local Nature Reserve.

The purpose of the project at Straits Mill was to renovate and rehabilitate an old flood attenuation pond adjacent to the River Blackwater to provide higher quality riparian habitat. Initially constructed in the 1980s, this feature had over time become increasingly overgrown and overshaded with a combination of Alder, bramble and nettle. It had more importantly completely separated from the river, becoming increasingly stagnated with both the mud and water quality almost lifeless.

Given the current status of the pond, and the complete lack of invertebrate interest, it was decided to completely reset the clock on this pond and remove the overshading trees, reconnect the original pipe and open up the return channel to the river for the benefit of fish, invertebrates and flora. It will also serve to store and attenuate flood water by being hydrologically linked to the river.

The work on the pond was undertaken in winter 2015. Once the trees were in full leaf, little or no sunlight would be able to reach the surface of the pond. The task in October 2016 was to remove the overshading trees to aid both access for machinery and to help increase the amount of light reaching the surface of the renovated pond. Once the trees were removed they were chipped up to reduce arisings. The water colour was a dark black which suggests de-oxygenated and stagnant water.

With the trees out the way, the excavator was able to access the pond and begin desilting the base and extending the area of the pond. Once the desilting was complete, the next task was to reprofile the sides of the pond and place the coir roll. The way water worked around the site was also changed, with the pipe lowered to ensure that water was always present in the pond.

The final product has an increase in water as it has a much more open aspect, with the overshading completely removed. As it settles down we expect to see some great results from this project, not only ecologically but in its ability to hold and attenuate floodwater.

Thanks and acknowledgements must go to Billericay District Angling Club and its members, also the Environment Agency for supplying the funding.